liuvy 2008-7-1 14:30
VSM data box
OCT= Time ---------Operator Cycle Time
MCT= Time ---------Machine Cycle Time
D/R= Time ---------Drop Off Rate( How often a finished part is completed off the end of the process)
PLT= Time ---------Process Lead Time
BATCH= pieces ----Batch Size
PTP = Time -------Process Time Per Piece
PEJ = % ---------Reject Rate
U/T = % ---------Uptime
C/O= Time ---------Changeover Time
EPE= Time ---------Every Part Every (How often every part number is run though the process,setup Wheel)
PITCH= Time ------Pitch interval
T/T =Time ------Takt Time
SH = # ------Number of the shift this process is run